Instructions
Things You'll Need
attach the water valve to the cold water line and tighten screws.
turn the valve all the way in so it pierces the pipe.
After lines are attached turn water on and test for leaks
Purge line by extracting at least 1 gal of water through dispenser.
491 views
Usually answered in minutes!
×