Starting at the wood cut tower moving clockwise.
Tower is 6.
6 to 7 to 8, L2, 9, L4,10,L5,11,fits into tree trunk, 14, (12 connects to the junction) 1, 2, (joins to 13 from the log over.)
L5, 3, L4, 4, L4, 5, connects to 6, the tree tower.
The logging tower rails.
Connects from 4 to 18, then the tall tower, the rail, the small tower, 17, L2, 16, L4, 15, the tall tree tower, 14, L4, 13 and that connects to No. 2.
L2 is the lowest support.
L4 is the middle size.
L5 is the tallest.
Main loop, starting at the Wood Cutting Building (tracks 6 and 7 are built in to this) and going clockwise: Track 6 is part of the building; Track 7 is also part of the building; Track 8, curving left, to L2 support; Track 9, curving right, to L4 support; Track 10, curving right, to L5 support; Track 11, curving right, through the lower part of the Tree Tower, no support; Right leg of Track 12, curving right, no support; Left leg of Track 12 ends with rail stop; Track 1, with stop lever on left of track, to L2 support; Left leg of Track 2 (the short leg), curving right, to L5 support; Track 3, curving right, to L4 support; Main leg of Track 4, with left leg going straight & right leg curving right, to L4 support on both ends; Track 5 onto left leg of Track 4, curving right, connecting to Track 6 at the Wood Cutting Building; Zip Line Loop, starting at Right leg of Track 4, which should have an L4 support, and going clockwise; Track 18, curving right, to Tall Zip Line Tower; Zip Line Rail, to Short Zip Line Tower; Track 17, going underneath main loop track and to the right of L5 support, curving right, to L2 support; Track 16, curving right, to L4 support; Track 15, curving right, to upper part of Tree Tower as support; Track 14, curving right, to L4 support; Track 13, curving left, to L2 support, connecting to right leg of Track 2 (the long leg); Track 2 is back to the main loop
Sorry folks, I lost all of my formatting when this submitted, for some reason. It should be more legible with a new line at every semi-colon, but I don't know how to edit after its been submitted.
Also, forgot to add about the supports: L2 is the lowest support. L4 is the middle size. L5 is the tallest
If you do this right, the train will run clockwise and the only "switch" that it can choose from without going backwards will be choosing between the zip line or wood cutting building. All the rest of the switches should flow into the main path. Also, the zip line should hold itself in place at the tall tower until the train releases it. If it doesn't, you may need to flip the zip line rail the other direction.
×
SOURCE: I need instructions for Thomas
Do you still need this? I just found mine because I had to re-assemble ours.
SOURCE: I need the instructions for Thomas Misty Island
Hi,
This will help you out.
http://service.mattel.com/us/product_detail.asp?id=R9634&Ntt=R9634&Pn=1&Brand=Fisher-Price+Friends&Cat=Thomas+The+Train+TrackMaster
Please do rate the solution if the issue is resolved or post a comment for further assistance.
Thank you for using fixya have a nice day:-)
4,474 views
Usually answered in minutes!
×